Alert: Link Failure

SUMMARY

Issues with post processing

ISSUE

When a job completes, additional tasks take place after the job processing has finished. For example, after a Virtual Full backup is finished writing to storage, a file linking process takes place. If an error is encountered during post processing, an alert is logged and an email is sent (if configured). Backups that encountered a post-processing error should be run again to ensure the integrity of the backup data. If the flagged backup was created with CBT turned on, the next backup will be forced to run with CBT off to ensure the integrity of future backups.

Was this article helpful?
0 out of 0 found this helpful
Have more questions? Contact us